When purchasing engine components such as in-frame kits, out-of-frame kits, long blocks, or complete engines, the following break-in procedure is recommended for heavy-duty diesel engines.
Important Notice
- This procedure is a recommended guideline only
- Due to variations in engine builds, machining quality, tuning, installation, and operating conditions, results are not guaranteed
- This procedure assumes proper machining, cylinder finish, clearances, and assembly
- Break-in will not correct improper build conditions
- Improper installation or operation may result in engine damage
Before Initial Startup
- Verify all fluids are filled to proper levels
- Prime lubrication system (if applicable)
- Start engine and immediately confirm oil pressure
- Inspect for leaks, abnormal noises, or issues
- Do not allow engine to idle more than 2–3 minutes before beginning operation
Break-In Operation (Critical Period)
The first 50 miles (on-highway) or 2 hours (off-highway) is the primary ring seating phase.
Required Operating Conditions:
- Operate engine under high load (70–90% engine load once at temperature)
- Load must come from cylinder pressure (boost + fueling), not RPM alone
- Use proper gearing to keep engine in working RPM range under load
- Use frequent acceleration and deceleration cycles (load → decel → load)
- Do not hold constant RPM or light-load cruise conditions
Controlled Heat Cycling (Critical)
Heat must be generated under load — not by idling or free-revving.
- Bring engine to the high end of normal operating temperature under load
- Once at temperature, apply high load (70–90%) repeatedly
- Allow slight cooling, then repeat
Required:
- Perform multiple aggressive heat/load cycles during the first 50 miles / 2 hours
- Heat cycles must occur under boost and fueling (working conditions)
Do Not:
- Idle to build heat
- Rev engine in neutral
- Drag brakes to simulate load
- Apply heavy load before engine reaches operating temperature
- Exceed normal operating temperature
Temperature Guidelines
- Engine must reach full operating temperature under load before high load is applied
- Operate repeatedly at the upper range of normal temperature
- Do not allow overheating under any circumstance
- Monitor coolant temperature continuously
Idle Restrictions
- Idle must be minimized
- Do not idle longer than 5 minutes at any time
- Excessive idling will prevent proper ring seating
Monitoring During Break-In
Pull over periodically and inspect:
- Oil leaks or contamination
- Coolant leaks
- Fuel leaks
- Loose fittings, hoses, or clamps
- Abnormal noises or vibration
Early detection of issues is critical.
After Initial Break-In
After approximately:
- 50 miles / 2 hours → Primary ring seating complete
- 100 miles / 3–4 hours → Stabilization complete
After this point:
- Normal operation may begin
- Continue to avoid excessive idling
- Continue monitoring engine condition
Oil Recommendation (Important)
- Use approved break-in oil or conventional 15W-40 during initial break-in
- Avoid excessive friction modifiers during initial seating unless validated
- First oil change recommended at 500–1,000 miles (10–25 hours)
What to Avoid
- Overheating
- Excessive idling
- Light-load operation
- Constant RPM operation
- High load on a cold engine
- Ignoring abnormal conditions
Key Principles
Proper break-in requires:
- High cylinder pressure (load)
- Heat within normal operating limits
- Aggressive variation (load + decel cycles)
Engines must be broken in under real working conditions — not idle conditions.
Failure to follow this procedure may result in improper ring seating, oil consumption, reduced engine life, and possible denial of warranty claims.
Effective date: November 19, 2026.